Waste Water Treatment-Electrical Reliability Improvement

IQA performed an initial study followed by engineering design to upgrade Electrical Infrastructure of the City of Palm Springs Waste Water Treatment Plant (WWTP). Modifications were necessary to increase reliability of the utility feed system as well as adding a standby power system and power generator. IQA also provided Construction support and prepared an Operation and Maintenance manual for the newly modified system.

Related Projects